FREMANTLE TRAFFIC BRIDGE PILE ENCAPSULATION

The scope of the work involved repairs to the timber piles to Bridge 0916 located over the Swan River on Queen Victoria Street. Bridge 0916 was constructed in the 1930s and is one of the largest timber bridges in Western Australia. The existing timber piles supporting the 4 main piers in water depths of up to 12m had the existing concrete protection systems removed and a new reinforced concrete encapsulation installed. Protective wrapping was also requi...

CLIENT: Main Roads WA

COST: $3 Million+GST

DURATION: Nov 2016 - July 2017

2017-01-19 08.32.19

REMEDIAL WORKS TO THE BOARDWALK AT DUNDAS POINT, APPLECROSS

This project involved the demolition and reconstruction of a 90m section of a boardwalk located in Applecross. The project was completed on time and on budget with no environmental or safety incidents. The project included: Construction of and maintenance of a track within the tidal zone of the swan river to provide access to the work zone; Temporary removal of timber handrails for reuse upon completion of the new boardwalk; Removal and disposal of a...

CLIENT: City of Melville

COST: $399,000 + GST

DURATION: October 2016 - January 2017

20160719_090316

MORLEY FLINDERS INTERSECTION IMPROVEMENTS

This project involved the re-construction of the intersection of Morley Drive and Flinders Street in Yokine. This included new and modified drainage; the widening of Morley Drive; extension of the eastbound and westbound turn pockets; and the reconstruction of the existing asphalt surface to new design levels and grades. The project included: Liaising with the neighbouring stakeholders to reduce the Project’s impact on the daily operations of the community...

CLIENT: DownerMouchel

COST: $2.1 million + GST

DURATION: April 2016 – July 2016

DJI_0066

MOORA BRIDGE REFURBISHMENT

This Project involved the repair and maintenance of an existing timber bridge located on Midlands Road (near Moore Street) over Moore River in the Shire of Moora. The bridge consisted of an 8 span timber superstructure which was largely replaced for steel elements. Timber abutments and wingwalls were replaced with new concrete designs. A new reinforced concrete overlay was provided and widened to 12.3meters to cater for heavy vehicles (including a pedestrian footpat...

CLIENT: Main Roads WA (Wheatbelt Region)

COST: $2million

DURATION: March 2017 - August 2017

more

commleft

I would not hesitate in recommending Advanteering Civil Engineering for

any type of Civil Engineering Construction project

 

-Kon Bilyk, Projects Officer – City of Vincent

 

commright


systems

Our Systems, Your Success

ceo

Advanteering Commitment

I established Advanteering in 1980 and have guided the business as it matured from a small consultancy into a Construction Contractor. Advanteering is ready with an enthusiastic, eager to please, fully qualified group of engineers, to provide a civil engineering service of choice.
I believe the knowledge we share with others lasts forever. It is this idea, embodied in our name, which translates through into Advanteering’s passion to resolve problems to the advantage of all.

Dan Cunningham
Directorsig