Client: City of Swan

Construction Period: May 2018

Total Value: $41,000 + GST

This project required concrete aprons to be poured and lateritic stone pitching installed to 6 storm water outlets that discharged into Emu Lake, Ballajura. The project included:
  • Working within the environmentally sensitive area surrounding Emu Lake, Ballajura;
  • Vegetation clearing including stump grinding;
  • Earthworks and subgrade preparation;
  • Reinforced concrete slabs;
  • Stone pitching with laterite spalls;
The project was effectively managed without and Safety or Environmental incidents. All of the works were completed on time and within budget.