Client: City of Swan

Construction Period: Aug 2016

Total Value: $220,000+GST

This project involved the supply and construction of a precast panel boat ramp including limestone rock armor protection and minor earthworks to shape the adjacent gravel carpark.

The project included:

  • Provision of  Construction  and  Environmental  Management  Plan  (CEMP)  to the approval of DPaW;
  • Provision of a Temporary Notice to Mariners (TNTM) including liaison with applicable stakeholders (Department of Transport; River ferries etc);
  • Site survey to determine the exact location and level of existing boat;
  • Removal of existing rock pitching on both sides of boat ramp;
  • Supply and installation of new concrete precast panel boat ramp including underwater screeding of aggregate base layer;
  • Placement of boat ramp precast panels by long reach excavator;
  • Gravel batter shaping of carpark;
  • Supply and installation of natural limestone rock pitching;

The project was effectively managed without environmental or safety incident. The works were completed ahead of schedule, within budget, to the satisfaction of all parties involved.