Client: Water Corporation

Construction Period: March – September 2007

Total Value: $885,000 + GST

The Works comprised of the replacement of two roofs to 9ML water tanks in Mandurah as follows:

  • Survey of tanks to be roofed;
  • Demolition and removal of the existing steel roof and ladders;
  • Installation of precast concrete footings and columns;
  • Replacement with a steel framed and steel clad roof, including access ladders and hatches; and
  • Ancillary works include providing FRP grilles over the inlet/outlet bellmouth in the tank floors.

This project was completed on budget and to schedule.