Client:Main Roads WA

Construction Period: Feb – March 2015

Total Value: $55,000 + GST

Working for MRWA, these works involved carrying out maintenance on the Albany Hwy bound bridge of Nicholson Rd, crossing the Canning River, in Cannington. This included the following:

  • Implementing a complex traffic management plan, which contra-flowed traffic across the adjacent bridge, for the duration of the project;
  • Replacing the existing compression seal, at either end of the bridge, with a suitably sized Tensa Compress A type compression seal, as supplied by Mageba;
  • Profiling 30m2 of asphalt over the approach slabs at either end of the bridge;
  • Laying 60m2 of asphalt; and
  • Reinstating reflective pavement markers.

 

The project was effectively managed without environmental incident. All aspects of the works were completed on time and on budget.