Client: City of Perth

Construction Period: November 2018 – December 2018

Total Value: $333,500 + GST

Advanteering completed these works for the City of Perth in December 2018. The project involved replacing 3 sections of the boardwalk at Point Fraser, located in the wetlands. 

Point Fraser is a public recreation reserve on the Swan River Foreshore, East Perth.  

The project included:

  • Isolating, removing and safely storing bollards
  • Removing decking screws, removing joists, carting materials back to the compound to be stockpiled and removing any nails/screws from the tops of bearers
  • Lifting, removing and disposing of existing jarrah decking
  • Replacing 80 of the H3 treated pine posts. New H5 treated pine posts were cut to length and installed.
  • Installation of new treated pine joists, approximately 1800m worth in total
  • Replacing all decking boards with mod-wood composite
  • Replacing and connecting bollard lights

The project was effectively managed without environmental incident. All of the works were completed on time and on budget.