Client: Department of Housing and Works
Superintendent: Wood & Grieve Engineers
Contract Period: June 2003 – September 2003
Total Value $727,562
The works consisted of the supply of materials, construction and maintenance during the defects liability period for the following items:
Client: PTA
Superintendent: PTA
Contract Period: 13th Mar - 23rd June 2003
Total Value $ 448,000
Advanteering-Civil Engineers was awarded a contract to:
Client: WaterCorp
Superintendent: WaterCorp
Contract Period: 2nd May - 25th July 2003
Total Value $ 212,000
The works consisted of the supply of materials, construction and maintenance during the defects
liability period for a 1,000m3 capacity, circular reinforced
concrete, steel roofed water storage tank, pipework and appurtenances.
It
consisted of the demolition and removal of an existing 225kL RC tank with
steel roof, filling in of a disused drainage sump, site fencing, removal of
a shed and septic tank, kerbing and regrading and resurfacing the site as
shown on the drawings.
Client: Main Roads
Superintendent: Main Roads
Contract Period: Jan-Dec 2002
Total Value $3.4 million
This project is the continuation of the initiative to provide a dual use path along all of the metropolitan railway lines. This project includes the construction of two Principal Shared Paths in Leederville and East Perth.
The Leederville section includes:
The East Perth Section includes:
Principal: Town of Claremont
Superintendent: McDowell Affleck
Contract Period: 2nd Oct-1st Nov 2002
Total Value: $ 93,000
"This project involved the demolition of the existing timber sleeper retaining wall opposite the subway near the Claremont Showground and the subsequent reconstruction of the wall using keystone blocks. "
Principal: WAGR
Superintendent: BSD Consultants
Contract Period: 29th March - 25th July 2002
Total Value: $ 425,000
This contract was carried out for the WA Government Railways Commission to upgrade and modify the carparks at Westrail Centre, East Perth (West Parade and East Parade).
The project included:
Principal: Main Roads
Superintendent: Main Roads
Contract Period: 16th Sept - 21st Dec 2002
Total Value: $ 804,000
This project involved the construction of an experimental stabilised earth noise wall along Tonkin Highway in Embleton.
For the first time in Australia, the stabilised earth material was sprayed using gunite methods, rather than previous conventional ramming techniques. This PISÉ (Pneumatically Impacted Stabilised Earth) method was developed and used successfully in California.
The wall was approximately 625 meters long and 3.5 meters high above a concrete footing. The project was carried out for the benefit of local residents by lowering the noise generated by the heavy traffic along Tonkin Highway.
Also part of this contract was the extension of a limestone block wall and colourbond fence.
Principal: City of Belmont
Superintendent: Hames Sharley Architects
Contract Period: 29th June-16th Oct 2001
Total Value: $ 335,413
Working for the City of Belmont, this project involved the construction of a boardwalk and gazebo over Tomato Lake, Kewdale.
The project included:
Principal: Department of Transport
Superintendent: Port and Harbours Consultants
Contract Period: 22nd Jan-31st May 2001
Total Value: $ 1.7 million
This contract for the Department of Transport involved the construction of a commercial jetty and the associated shore works at Cervantes.
Works were completed 8 weeks ahead of schedule.
The project included:
Principal: WestNet Rail
Superintendent: BSD Consultants
Contract Period: 16th Mar-14 Jun 2001
Total Value: $ 333,000
This project involved the construction of a "noise wall'' to protect surrounding residents and businesses from noise generated by freight trains servicing Kwinana industries near the Cockburn Sound. Working for Westnet Rail, the job included associated earthworks and the erection of 430 metres of a 4 metre high wall, which consisted of steel columns and recycled plastic sheeting between columns.
Principal: Tiwest
Superintendent: Tiwest
Contract Period: 18th Sept - 1st Oct 2001
Total Value: $ 50,000
Construction of reinforced concrete drainage sumps and channel drains for the relocation of the south mine site at Tiwest Minesite, Cataby.
Principal: Main Roads WA
Superintendent: Main Roads WA
Contract Period: 9th Feb 2000 - Oct 2000
Total Value: $ 1.4 million
Bikewest WA plans to link all railway stations with a dual use path. As part of this initiative, this project for MRWA included:
Client: Department of Transport
Superintendent: MPS Architects
Contract Period: 17th Jan 2000-11th March 2000
Total Value $ 185,000
As part of the upgrade of the Oats St Railway Station, a new Bus Station adjacent to the station was constructed for the Department of Transport, including: