Client:Main Roads WA

Construction Period: Dec 2013 – Jan 2014

Total Value: $360,000 + GST (Schedule of Rates)

This project involved completing maintenance repairs to the Fremantle traffic bridge (No. 0916) located on Queen Victoria Street spanning the Swan River. The work generally included the following preventative and specific maintenance:

  • Repair of split piles;
  • Tightening and corrosion treatment of existing pile straps;
  • Stringer bolting and packing;
  • Fungi treatment of outside timber stringers;
  • Termite treatment;
  • Replacement of missing timber kerbing;
  • Repair of spalled kerbing span 16, 24- 29;
  • Repairs to bridge and footpath bearers; and
  • Footpath joist repairs.