Client:City of Swan

Construction Period: April 15

Total Value: $80,000+ GST

This project involved the demolition of an existing timber bridge and the design & construction of a 7m long steel bridge (at the Red Hill Picnic area) and 12m long boardwalk (at FR Berry Reserve).

The project included:

  • Demolition of an existing 6m long timber bridge;
  • Design of steel bridge and boardwalk;
  • Construction of a 7m long steel bridge including concrete abutments, grated deck and hand railing;
  • Constriction of a 12m long steel boardwalk including pile supports, grated deck, and kick plates; and
  • Management of construction works (in particular hot works) in a bush environment.

The project was effectively managed without environmental or safety incident. All of the works were completed on time and within budget, to the satisfaction of all parties involved.